Share this:

" />
Published On: Sat, Nov 29th, 2014

Somaliland:Hargeisa JPLG programme well on course, says City Engineer

Share This
Tags

state house (2)By M.A Egge

SomalilandPress-The Hargeisa Municipal Council is steadfast on its Joint Project for Local Governance (JPLG) Program.

According to the capital’s JPLG coordinator, City Engineer Abdikhadar Abdillahi Ali, the 2013 (JPLG) projects on the rehabilitation and construction of roads was capped with the finalizing of the Boqol-Jire Irish-cross bridge.

state house

This has enabled easy access of commuting by the thousands of Ayaha 2 residents who are mostly internally displaced persons.

It now easily connects the Ibrahim Koodbuur and 31st May districts and nearby estates which were hitherto impossible across the river apart from a cumbersome long detour.

According to the engineer, their 2014 programs are at final stages.

 Eng. Abdikhadar

Eng. Abdikhadar

This, Eng. Abdikhadar says, includes the new east-west major highway cutting acrros three city boroughs that would immensity ease transport congestious at two major city highways.

academy3

This raod starts at the Peace Acedemy and ends at Daami area.

Another one is the state house road bridge which had long succumbed into oblivion hence is now undergoing construction and is expected to end on schedule.

Lastly, according to the city engineer, is the ongoing construction of a priority Irish Cross bridge whose short-cut gravel road connects Hargeisa to Burao.

This bridge is quite important since it has been a major impediment to vehicles plying the route.

Eng. Khadar however explains of a slight hiccup in their schedule of work due to the recent heavy rains.

About the Author

- Mohamed Ibrahim Guled is the CEO, owner and chief editor of SomalilandPress

Leave a comment

XHTML: You can use these html tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>